MLM Veraart (Veraart++at++fel.tno.nl)
Mon, 26 Apr 1999 14:59:13 +0200
You have to move the viewer to the origin and translate the terrain
the same amount. Al calculations should be done in double and the
results put in the performer structures (float). There is a mail in the
archives describing this principle. I think it was Rob Jenkins who
wrote it. It should be in the 1996/1997 archives.
Mario
>
> thanks,
> --
> /*===============================================
> M. Devrim Erdem devrim++at++infotron-tr.com
> Chief Engineer
> Simulation & Software Development
> info(+)TRON, Turkey
> http://www.infotron-tr.com
> http://abone.turk.net/mderdem
> ===============================================*/
This archive was generated by hypermail 2.0b2 on Mon Apr 26 1999 - 05:58:06 PDT