Peter Ebbesmeyer (pe++at++hni.uni-paderborn.de)
Mon, 23 Oct 1995 17:30:40 +0100
we are using IRIS Performer to build a virtual factory. Now we consider to join
a project where we have to build a terrain model. We gained the experience that
creating the visual database is a very time consuming task and we do not have
much experience in building terrain models.
Therefore my question to those of you who have experience in building terrain
models: How long does it take for somebody who has experience with a state of
the art modeling tool to build a database of the size of the model used for the
Performer Town Demo provided terrain data and imagefiles for textures are
available? Sure, the answer to this question can only be an estimation but such
an estimation would be very valuable for us.
Thank you in advance for any answer,
Peter
-----------------------------------------------------------------------
Dipl.-Ing. Peter Ebbesmeyer Universitaet-GH Paderborn
Raum F0.210 Heinz Nixdorf Institut
Tel. + 49 5251 606234 Rechnerintegrierte Produktion
Fax. + 49 5251 606268 Fuerstenallee 11
email: pe++at++hni.uni-paderborn.de 33102 Paderborn
Germany
-----------------------------------------------------------------------
--
This archive was generated by hypermail 2.0b2 on Mon Aug 10 1998 - 17:51:58 PDT