Re: geoset lists

New Message Reply Date view Thread view Subject view Author view

Michael Jones (mtj++at++babar)
Thu, 9 Feb 1995 16:26:02 -0800


On Feb 9, 3:41pm, Lance R. Marrou wrote:
> Subject: geoset lists
:If I change the value in a geoset list (say a vertex coordinate, a strip
length
:for triangle strips, or something else) will it take effect immediately? Or
:do I need to call pfGSetPrimLengths() and pfGSetAttr() again? I would think
:the function calls are not necessary, but I would like confirmation. Thanks.

IRIS Performer does not cache any of the values in the geoset
data arrays, so if you make a change it will have immediate
effect. (So immediate that you may not be able to perform the
write to X, Y and Z before the draw process comes along and
uses your new X with the old Y and Z when multiprocessing).

Take a look at the lake demo that shipped with 1.0 and 1.1
(if you still have these laying about). This demo shows how
to do multiprocessed real-time updates in sp and mp modes.

-- 

Be seeing you, Phone:415.390.1455 Fax:415.965.2658 M/S:8U-590 Michael T. Jones Silicon Graphics, Advanced Graphics Division mtj++at++sgi.com 2011 N. Shoreline Blvd., Mtn. View, CA 94039-7311


New Message Reply Date view Thread view Subject view Author view

This archive was generated by hypermail 2.0b2 on Mon Aug 10 1998 - 17:50:57 PDT

This message has been cleansed for anti-spam protection. Replace '++at++' in any mail addresses with the '@' symbol.