Marc SIMON Presales support (smarc++at++girl.paris.sgi.com)
Fri, 3 Feb 1995 09:13:08 +0100
I would like for scheduling a customer simulation to synchronize the
Graphics RE2 with the application.
I would like to manage the Vertical Retrace Interrupt to schedule the
simulation.
I know that we can do this with FRS and with Performer but the customer
don't want to use this tools presently.
So if you know how to manage this Interrupt thanks to give me some ideas.
Thanks,
--
-- Marc -- Marc SIMON Presales support
===========================
--------- ////// // // ////// /////// /////// -----------
// // / / // // // / / //
--------- ///// // / // ///////// /////// // -----------
// // // // // /// //
--------- /////// // // // // / /// /////// ----------
Silicon Graphics France
21 Rue Albert Calmette
Jouy-en-Josas 78350 FRANCE
Tel (33) 1 34-88-80-00
email : smarc++at++paris.sgi.com
++++++++++++++++++++++++++++ smarc++at++paris.sgi.com ****************************
This archive was generated by hypermail 2.0b2 on Mon Aug 10 1998 - 17:50:56 PDT