Ran Yakir (rany++at++bvr.co.il)
Thu, 27 Jan 1994 16:27:42 +0000
I'm trying to get into the culling process and add some other culling
types.
So far I succeeded doing that in the pre-culling function. The problem is
that my culling stuff takes a lot of time, and I would like to perform
it for those nodes that passed the culling test (i.e. were not culled out).
Does anybody know how can I tell, while in the post culling callback, if the
node was culled out or not ?
Thanks
Ran Yakir