| To: | netdev@xxxxxxxxxxx |
|---|---|
| Subject: | [2.6 PATCH] Fix IPVS sync state check |
| From: | Wensong Zhang <wensong@xxxxxxxxxxxx> |
| Date: | Mon, 13 Oct 2003 23:15:26 +0800 (CST) |
| Cc: | "David S. Miller" <davem@xxxxxxxxxx>, Julian Anastasov <ja@xxxxxx> |
| Sender: | netdev-bounce@xxxxxxxxxxx |
Hi, Here is a one-line fix in the sync state check for the connection to be synchronized. Since both the primay and the backup IPVS sync daemon can be started in a box at a time now, we must check if the MASTER bit is set in the sync state exactly. Please check and apply it. Thanks, Wensong
|
| <Prev in Thread] | Current Thread | [Next in Thread> |
|---|---|---|
| ||
| Previous by Date: | Re: patches for PROC_FS=n (2.6.0-test7), Randy.Dunlap |
|---|---|
| Next by Date: | Re: patches for PROC_FS=n (2.6.0-test7), Elmer |
| Previous by Thread: | [PATCH SET][bonding 2.4] cleanup - take 3, Shmulik Hen |
| Next by Thread: | Re: [2.6 PATCH] Fix IPVS sync state check, David S. Miller |
| Indexes: | [Date] [Thread] [Top] [All Lists] |