Mark Goodwin wrote:
Christoph Hellwig wrote:
folks, any chance to get take messages sent to the list, please?
do you mean for any checkin, or just oss pushes?
Kust
saw the tree is merged up to 2.6.25 (why not .26-rc, btw?) and there's
been no take message sent to the list again..
Lachlan was held up with QA failures on updating the internal dev tree,
which was in turn holding up .26-rc I think.
Lachlan, what's the status with this?
It was a big TAKE message so it was probably dropped on the floor
somewhere.
Updates to the internal dev tree are dependent on the kdb patches
and at the time they were only available for 2.6.26-rc1. 2.6.25
was a more stable choice. We usually wait until -rc3 for an update
so as soon as the kdb patches are available I'll do another merge.
|